other.htm
![]() Inverter display. | ![]() Litium 48 volt battery. | ![]() Copper buss bars on batteries. |
![]() Testing system before shipping. | ![]() The completed electrical system. | ![]() Final test,labels added. |
![]() Outback FM-80 MPPT solar controller. | ![]() Transporting solar over lake. | ![]() 12 by 360 watt panels installed. |
![]() Magnum MS 4024 inverter panel. | ![]() Xantrex SW-4025 inverter panel. | ![]() 48 volt 700 amp hour battery. |
![]() Surrette S6-L16-HC batteries, wired to 24 volts. | ![]() Nozzle on ES&D turbine and turgo wheel. | ![]() 4S2P configuration lead acid batteries. |
![]() Final inspection, 1500 watt array. | ![]() ES&D water turbine with plastic runner. | ![]() Power cables in conduit run under water. |
![]() Wiring the array. | ![]() Dual FM80 controllers. | ![]() Laying out wire for conduit. |